Project Info
  • Client: Cuningham Group Architecture, Inc.
  • Owner: St. Vrain Valley School District
  • Project Cost: $9,500,000
Sectors

Natatorium addition to the existing Silver Creek High School building. The natatorium includes a pool and a locker room section. The building addition consists of a precast pool shell building and a structural steel locker room and mechanical, electrical, and plumbing (MEP) systems building.